Challenges
WHAT WAS INVOLVED
In early 2015, the Port of Nigg undertook an extensive £20 Million redevelopment project, which involved the resurfacing of the entire length of the Quayside front and the addition of the new West Finger Jetty. For the new West Finger Jetty, Holophane supplied 52 HMAO (High Mast Advanced Optic) LED luminaires with a combination of 6 head and 10 head frames assembled on 30 metre masts.